Builder Console
Designs, orders, signoff, and Tapeout Voyage.
A mock logged-in dashboard for managing design submissions, binding orders, paying after signoff, and tracking manufacturing WIP.
My Designs4
My Orders3
Coupons2
tiny-riscv-core
Cruise MPC
PassedPaidCruise MPC
sensor-fusion-asic
Freighter MPC
PendingOrder draftFreighter MPC
edge-ai-mcu
Ark MPW
UnsubmittedNo orderArk MPW
My Designs
Submitted design assets and signoff status by template.
| Design | Template | Required files | Signoff | Order |
|---|---|---|---|---|
| tiny-riscv-core SUB-2607-018 |
Cruise MPC 36 IO + retroSoC |
DEF, Verilog netlist | Passed DRC/LVS/density/XOR accepted |
ORD-2607-104 |
| sensor-fusion-asic SUB-2610-042 |
Freighter MPC 73 programmable IOs |
DEF, Verilog netlist | Pending Manual signoff review queued |
Draft order |
| edge-ai-mcu SUB-2610-059 |
Ark MPW private 2.4 mm² die |
GDS required, DEF optional | Unsubmitted Ready to bind to order |
Not bound |
| ysyx-cache-lab SUB-2610-064 |
OSOC MPC course-aligned |
DEF, Verilog netlist | Failed Clock constraint report needs update |
Not payable |
My Orders
Orders bind a submission to a shuttle and selected services.
| Order | Bound submission | Services | Payment | Tapeout Voyage |
|---|---|---|---|---|
| ORD-2607-104 ECOS55-2607 |
tiny-riscv-core Cruise MPC |
Default package, devboard, bring-up | Paid $730 mock total |
GDS Ready |
| ORD-2610-033 ECOS55-2610 |
sensor-fusion-asic Freighter MPC |
Signoff, default package | Awaiting signoff Payment locked |
Design Submitted |
| ORD-2604-087 ECOS55-2604 |
gpio-lab-core Freighter MPC |
Bare die, board assembly | Paid $580 mock total |
Wafer Fabrication |
Tapeout Voyage WIP
Detailed manufacturing status for ORD-2604-087.
Design SubmittedSubmission bound to order before deadline.
Actual 2026-03-18GDS ReadyTemplate integration and final package prepared.
Actual 2026-04-04TapeOutFoundry handoff complete.
Actual 2026-04-09JDV checkManufacturing data verification accepted.
Actual 2026-04-17Wafer StartLot entered fabrication.
Actual 2026-04-29Mask INMask set released.
Actual 2026-05-07Wafer FabricationMask Layer Progress: diffusion, poly, and metal layers are being tracked.
Actual 2026-06-09Wafer OutSort and release from foundry.
Planned 2026-07-22Wafer DicingDice prepared for package and bare die delivery.
Planned 2026-08-02PackagingDefault package lane for selected orders.
Planned 2026-08-18Board AssemblyDevboard assembly and bring-up support.
Planned 2026-09-03Customer ShippingShipment and delivery confirmation.
Planned 2026-09-20