Builder Console

Designs, orders, signoff, and Tapeout Voyage.

A mock logged-in dashboard for managing design submissions, binding orders, paying after signoff, and tracking manufacturing WIP.

Signed in as Maya Chen2 active orders
My Designs4
My Orders3
Coupons2
tiny-riscv-core
Cruise MPC
PassedPaid
sensor-fusion-asic
Freighter MPC
PendingOrder draft
edge-ai-mcu
Ark MPW
UnsubmittedNo order

My Designs

Submitted design assets and signoff status by template.

DesignTemplateRequired filesSignoffOrder
tiny-riscv-core
SUB-2607-018
Cruise MPC
36 IO + retroSoC
DEF, Verilog netlist Passed
DRC/LVS/density/XOR accepted
ORD-2607-104
sensor-fusion-asic
SUB-2610-042
Freighter MPC
73 programmable IOs
DEF, Verilog netlist Pending
Manual signoff review queued
Draft order
edge-ai-mcu
SUB-2610-059
Ark MPW
private 2.4 mm² die
GDS required, DEF optional Unsubmitted
Ready to bind to order
Not bound
ysyx-cache-lab
SUB-2610-064
OSOC MPC
course-aligned
DEF, Verilog netlist Failed
Clock constraint report needs update
Not payable

My Orders

Orders bind a submission to a shuttle and selected services.

OrderBound submissionServicesPaymentTapeout Voyage
ORD-2607-104
ECOS55-2607
tiny-riscv-core
Cruise MPC
Default package, devboard, bring-up Paid
$730 mock total
GDS Ready
ORD-2610-033
ECOS55-2610
sensor-fusion-asic
Freighter MPC
Signoff, default package Awaiting signoff
Payment locked
Design Submitted
ORD-2604-087
ECOS55-2604
gpio-lab-core
Freighter MPC
Bare die, board assembly Paid
$580 mock total
Wafer Fabrication

Tapeout Voyage WIP

Detailed manufacturing status for ORD-2604-087.

In progress
Design SubmittedSubmission bound to order before deadline.
Actual 2026-03-18
GDS ReadyTemplate integration and final package prepared.
Actual 2026-04-04
TapeOutFoundry handoff complete.
Actual 2026-04-09
JDV checkManufacturing data verification accepted.
Actual 2026-04-17
Wafer StartLot entered fabrication.
Actual 2026-04-29
Mask INMask set released.
Actual 2026-05-07
Wafer FabricationMask Layer Progress: diffusion, poly, and metal layers are being tracked.
Actual 2026-06-09
Wafer OutSort and release from foundry.
Planned 2026-07-22
Wafer DicingDice prepared for package and bare die delivery.
Planned 2026-08-02
PackagingDefault package lane for selected orders.
Planned 2026-08-18
Board AssemblyDevboard assembly and bring-up support.
Planned 2026-09-03
Customer ShippingShipment and delivery confirmation.
Planned 2026-09-20